Guide for the Planning and Construction Phase: How to Optimize Your Projects!

16. June 2025

Clear guidelines: Your key to more efficiency and safety on the construction site

Let’s be honest: The construction industry can be quite complex, can’t it? Many actors, tight schedules, strict budgets. For projects to avoid sinking into chaos and successfully go live, it requires clear structures and processes. This is exactly where guidelines for the planning and construction phase come in. Think of them as a solid foundation that ensures efficient workflows and guarantees a high level of safety on the construction site. Without such guidelines for the planning and construction phase? It can quickly become confusing, leading to mistakes, delays, and yes, higher costs as well. In this article, we will take a look together at the different types of guidelines and show you how to optimally utilize these important guidelines for the planning and construction phase for your construction projects. At Valoon GmbH, we know the pitfalls in project management all too well. That’s why we have developed our cloud-based construction management software – a solution that helps you keep track and optimize communication. Let’s explore together how you can elevate your projects to a new level with the right guidelines for the planning and construction phase and modern tools.

  • Create clear structures and processes for construction projects.
  • Ensure more efficiency and a high level of safety.
  • Minimize risks, errors, delays, and costs.
  • Ensure that all parties work according to the same standards.

Importance of guidelines for efficiency and safety – More than just paperwork!

Guidelines are much more than just dry regulations. Think of them as your most important tools for risk minimization and quality enhancement. They ensure that everyone involved in the project – from the client to the planner to the executing company – pulls together and works to the same standards. A shared understanding of project goals is invaluable, especially when it comes to compliance with the guidelines for the planning and construction phase standards. Through standardized processes, for example with a practical checklist for the construction phase, error sources can be identified and addressed early. The result? Fewer rework, optimized resource use, and ultimately higher cost-effectiveness. And regarding occupational safety: Binding guidelines for the planning and construction phase are essential here to avoid accidents and protect the health of your employees. This minimizes downtime and boosts productivity – a win-win situation.

Types of guidelines: A small guide through the jungle

In construction, there is a wide range of guidelines, from general laws to very specific rules for your company. At the top are the legal guidelines, such as the Construction Site Ordinance or the state building codes – there’s no way around them. Then come the technical standards and guidelines (think of DIN standards or VDI guidelines). They define the recognized state of the art and serve as your benchmark for quality. Often, they form the basis for the correct implementation of the guidelines for the planning and construction phase. Many companies go a step further and develop their own company-specific guidelines for the planning and construction phase. These are then perfectly tailored to their own workflows, experiences, and quality requirements. This can include detailed instructions for specific construction methods, handling materials, or how internal communication should occur – often practically documented in a software for construction planning and execution.

What we want to impart: Orientation for everyone involved in construction

What do we want to achieve with this article? Quite simply: We want to provide you – whether client, planner, or executing company – with a comprehensive guide through the sometimes somewhat bewildering jungle of guidelines for the planning and construction phase construction regulations. We are not only concerned with familiarizing you with the legal and technical frameworks. We also want to show you practical approaches on how you can effectively implement these guidelines for the planning and construction phase in your projects. A particular focus is on improving collaboration and communication among all parties involved. Because let’s be honest: Only when information flows smoothly and everyone knows what they are responsible for can construction projects truly succeed. Our goal is to equip you with the tools to make your construction projects safer, more efficient, and of high quality – also supported by modern aids such as a construction planning app.Laws and standards in check: How to master the basics for your construction project

Without a solid legal foundation, nothing works in construction – we all know that. Compliance with legal and regulatory fundamentals is not just a dull duty, but the be-all and end-all for any successful construction project and a core part of the guidelines for the planning and construction phase. These regulations provide important guidelines for the planning and construction phase, not only set minimum standards for safety and quality but also clarify who is responsible for what. Those who are well-acquainted with these requirements guidelines for the planning and construction phase minimize legal risks and ensure a smooth project process. From the construction site ordinance to special laws like the Railway Crossing Act – the list is long and demands our full attention. Because honestly, who wants to risk hefty fines, throw the schedule out the window, or grapple with unexpected additional costs? Exactly. That’s why it’s so important to deal with these issues early on. It is a true key to project success. guidelines for the planning and construction phase auseinanderzusetzen. Das ist ein echter Schlüssel zum Projekterfolg.

  1. Compliance with legal and regulatory foundations is crucial for every construction project.
  2. The Construction Site Ordinance (BaustellV) regulates core duties such as appointing a safety and health protection coordinator (SiGeKo).
  3. Specific laws like the Railway Crossing Act (EKrG) and cultural construction guidelines of the federal government address special requirements.
  4. State building codes (LBO) and DIN standards define detailed technical and quality standards for construction execution.

Construction site ordinance (BaustellV): Your core duties at a glance

The Construction Site Ordinance (BaustellV) is something like the hub of German construction law. It places obligations on the client and other parties when it comes to safety and health protection on construction sites. One very important point: the requirement to appoint a safety and health protection coordinator (SiGeKo). This becomes relevant when employees of different companies are active on the construction site. The SiGeKo is the extended arm of the client, creates the safety and health protection plan (SiGe-Plan), and ensures that the measures of the individual trades work in harmony. But also the advance notice for larger construction projects and the creation of a document for later work on the structure fall into the client’s responsibilities under the guidelines for the planning and construction phase. These guidelines for the planning and construction phase are absolutely crucial to avoid accidents and protect the health of everyone on the construction site. The GDA guideline “Planning and execution of construction projects” provides valuable practical tips and emphasizes the importance of information exchange – a point also highlighted in the research input.

Special cases, special rules: Railway Crossing Act and cultural construction guidelines

In addition to general regulations like BaustellV, there are also regulatory frameworks and specific guidelines for the planning and construction phase for very special construction projects. Take the Railway Crossing Act (EKrG): It regulates everything around planning, construction, and financing when railways and roads intersect. The guideline mentioned in the research input “Guideline for planning, constructing, and billing measures according to the Railway Crossing Act” dated 02.03.2015 is an important reference work here. And then there are the Cultural construction guidelines of the federal government, which are becoming increasingly significant. Their goal? To establish construction culture as a societal value and improve the quality of our built environment. This involves promoting renovation culture, responsible land use, more greenery in the city, and integrated urban development. For federal buildings, these guidelines are a self-commitment and a clear recommendation for states and municipalities to create sustainable and aesthetically pleasing guidelines for the planning and construction phase environments.

There’s more: Other important laws and standards

The spectrum of relevant laws and standards is far from exhausted. The State building codes (LBO) of the individual federal states, for example, contain detailed regulations serving as guidelines for the planning and construction phase guidelines for construction applications, stability, fire protection, and many other aspects. They are the first point of contact for the approval and execution of construction projects. And then, of course, DIN standards play a huge role – they are the recognized rules of technology. They define quality standards for building materials, construction methods, and components and are often an integral part of contracts. Compliance is not only important for liability but also for the safety and durability of structures. For all of us in the construction industry, it is essential to continuously keep an eye on current standards and laws to ensure compliant and high-quality – sie sind die anerkannten Regeln der Technik. Sie definieren Qualitätsstandards für Baustoffe, Bauverfahren und Bauteile und sind oft fester Bestandteil von Verträgen. Ihre Einhaltung ist nicht nur für die Gewährleistung wichtig, sondern auch für die Sicherheit und Langlebigkeit von Bauwerken. Für uns alle in der Baubranche gilt: Ein kontinuierlicher Blick auf aktuelle Normen und Gesetze ist unerlässlich, um konforme und qualitativ hochwertige guidelines for the planning and construction phase and thus optimize the construction planning..More than just regulations: Technical guidelines for better construction processes

In addition to laws, there is a whole world of technical guidelines for the planning and construction phase and recommendations – from professional associations, research institutions, and also from companies themselves. These are invaluable for the successful implementation of our construction projects. Often, these guidelines for the planning and construction phase general requirements make things truly tangible and provide us with practical assistance for the tricky challenges in planning and execution. They show us what the current state of technology is and help us improve quality, safety, and efficiency on the construction site. Observing these guidelines for the planning and construction phase is not only a sign of professionalism. It is often crucial to avoid defects and ensure the long-term value of our structures. A great example is the digital construction site – without technical standards, it would be unthinkable.

GDA guideline: Together for fewer accidents

The ‘Guideline Planning and Execution of Construction Projects’ of the Joint German Occupational Safety Strategy (GDA) is a real game-changer when it comes to reducing workplace accidents in the construction industry. As mentioned in the research input, it places a strong focus on information exchange and well-coordinated collaboration among all supervisors. A core component is the information sheet for clients, which clearly outlines their duties according to the. Wie im Research Input schon erwähnt, legt sie einen starken Fokus auf den Informationsaustausch und eine gut koordinierte Zusammenarbeit aller Aufsichtspersonen. Ein Kernstück ist das Informationsblatt für Bauherren, das ihnen ihre Pflichten gemäß den guidelines for the planning and construction phase Construction Site Ordinance. But the guideline is even more than that: it is a treasure trove of work aids for occupational safety topics and promotes standardized exchanges about identified defects between accident insurance providers (UVT) and authorities. The goal of this guidelines for the planning and construction phaseis to identify and rectify safety deficiencies early – thereby significantly increasing safety on our construction sites.

Amprion: Network expansion with foresight and a green soul

Amprion’s planning guidelines for network expansion provide a great example of how technical guidelines for the planning and construction phase can also incorporate ecological and social aspects. According to the research input, Amprion follows the NOVA principle (network optimization and strengthening before expansion). This means, first, that they look at how to upgrade existing infrastructure. Since 2016, in the case of new construction of high-voltage direct current transmission lines (HGÜ), underground cables have priority unless existing routes can be utilized or environmental protection comes into play. When examining route variants, factors such as utilizing existing corridors, distances from settlements, and minimizing environmental impacts are considered. These. Das heißt, erstmal wird geschaut, wie man bestehende Infrastruktur ertüchtigen kann. Bei Neubauten von Hochspannungs-Gleichstrom-Übertragungsleitungen (HGÜ) gilt seit 2016: Erdkabel haben Vorrang, es sei denn, man kann bestehende Trassen nutzen oder der Umweltschutz spricht dagegen. Bei der Prüfung von Trassenvarianten werden Faktoren wie die Nutzung vorhandener Korridore, Abstände zu Siedlungen und die Minimierung von Umwelteingriffen berücksichtigt. Diese guidelines for the planning and construction phase in the infrastructure sector demonstrate how to responsibly handle resources and the environment and are an important building block for effective construction management..

Sustainable building: With BNB, lifecycle costs, and BIM into the future

Sustainable building is more than just a trend – it is our future. Specific guidelines for the planning and construction phase and evaluation systems like the Sustainable Building Assessment System (BNB) help us implement these principles concretely. A very important point here is the consideration of the entire lifecycle costs of a building, not just the construction costs upfront. As stated in the research input, for projects over €500,000, a lifecycle cost analysis is mandatory, including environmental follow-up costs (e.g., €237/ton CO2). Forming integrated planning teams early on and using Building Information Modeling (BIM) for better coordination and data transfer to CAFM systems are other important steps. These guidelines for the planning and construction phase help us build not only more environmentally friendly but also more economically over the entire usage duration of a building. A comprehensive operational folder, adherence to passive house standards, and the integration of renewable energies (especially photovoltaics) are also part of this. When selecting materials, the focus is on reused or recycled materials with low greenhouse gas emissions that can be easily disassembled. Water-saving measures and efficient ventilation technology round out the concept.

What it brings you: The benefits of technical guidelines at a glance

When we consistently apply technical guidelines, everyone involved benefits. Here’s how:

  • Improved quality: Adherence to recognized standards significantly increases construction quality and minimizes the risk of defects.
  • Increased safety: Specific safety guidelines, such as those of the GDA, significantly contribute to accident prevention on construction sites.
  • Increased efficiency: Standardized processes and clear directives optimize workflows, reduce rework, and save time and costs.
  • Legal certainty: Orienting oneself to current technical regulations minimizes liability risks and ensures compliance with contractual agreements.
  • Sustainability: Such guidelines for the planning and construction phase guidelines for sustainable building promote resource-saving construction methods and reduce environmental impact.

Your company, your rules: Tailored guidelines for your construction processes

Laws and technical standards provide us with a general framework, but with company-specific guidelines for the planning and construction phase we can truly tailor our processes to our specific needs, experiences, and risk profiles. These internal guidelines for the planning and construction phase are a tremendously powerful tool! With them, we can define quality standards, increase efficiency, and ensure that everyone in the company is rowing in the same direction and working according to the same principles. Developing and implementing such customized guidelines for the planning and construction phase is not a one-time thing, but an ongoing process. In doing so, we always consider the specific challenges of our industry and our projects. They also partially reflect our corporate culture and contribute significantly to long-term success by improving things like construction project management. Enable adjustment of processes to own needs, experiences, and risk profiles.

  • Define internal quality standards and enhance efficiency across the company.
  • Require a practical design based on self-analysis of processes and experiences.
  • Erfordern eine praxisnahe Ausgestaltung, die auf eigenen Prozessanalysen und Erfahrungen basiert.
  • Demand regular training for employees and active quality management for continuous updates and improvements.

Develop internal guidelines: Tailored and directly from practice

When we create internal guidelines for the planning and construction phase , we always look closely at our own processes and analyze where the typical challenges lie. It’s not about reinventing the wheel. Rather we adapt proven external standards to our specific circumstances and incorporate our own experiences. It is crucial for us that these guidelines for the planning and construction phase are formulated in a practical and understandable way so that our employees can truly adopt and live them in their everyday work. They should provide clear instructions for recurring tasks, quality checks, handling specific materials or technologies, as well as for internal and external communication. These guidelines for the planning and construction phase can also specify how we deal with unforeseen events or what escalation levels there are for problems. A good construction coordination software can greatly support us in this.

Knowledge is power: Training and continued education as the key to success

The best guidelines only yield results if our employees know them and understand how to apply them. That’s why regular trainings and continued education are a must for us. This ensures that everyone – from management to skilled labor – understands the internal guidelines for the planning and construction phase and recognizes how important they are for safety, quality, and efficiency. The trainings are not just about memorizing regulations. We also want to raise awareness of potential risks and encourage motivation to uphold the guidelines for the planning and construction phase standard. Practical exercises, case studies, and sharing of experiences help ensure that what is learned truly resonates in daily operations.

Always improve: Quality management for dynamic guidelines

Company-specific guidelines are not etched in stone with us. As part of our active quality management system, we continuously review them and adapt them based on new findings, changed conditions, or technological developments. Regular audits, feedback from the construction sites, and the analysis of near accidents or quality defects provide valuable insights on where we can improve further. This continuous improvement process (CIP) ensures that our guidelines for the planning and construction phase remain current and effective. Crucially, we involve our employees in this improvement process because they often have the best insights into what works in practice and where things may still be lacking.Live guidelines instead of just reading: How to overcome hurdles and improve communication

Let’s be honest, guidelines for the planning and construction phase implementing and then consistently applying guidelines is not always a walk in the park. There are definitely some challenges. The regulations can be quite complex, sometimes there is a lack of acceptance among those involved, or communication falters. All of this can slow down even the best guidelines for the planning and construction phase . That’s why it’s essential to recognize these potential hurdles early on and consider how to proactively address them. Only then can we ensure that guidelines do not just exist on paper but genuinely lead to better processes and outcomes in construction. An open error culture and the use of modern technologies can be incredibly helpful. Tackling these challenges is a significant step toward continuously optimizing our guidelines for the planning and construction phase operations.

Too many rules? Expert knowledge helps navigate the jungle

The sheer volume of laws, norms, and technical regulations can really overwhelm sometimes – especially for smaller companies or clients who don’t deal with them every day. Keeping these guidelines for the planning and construction phase and regulations in sight, interpreting them correctly, and staying updatedtakes a lot of time and requires specialized knowledge. To keep an overview and avoid costly mistakes, it can be very sensible to seek support from external experts. Specialized attorneys for construction law, engineering firms, or consultants can help us interpret guidelines for the planning and construction phase guidelines, assist in creating SiGe plans, or advise us on implementing quality management systems. Their expertise is invaluable for minimizing risks and ensuring compliance with all relevant requirements of the guidelines for the planning and construction phase law.

Participate instead of ducking: Create acceptance through transparency

Even the best guidelines are of no use if our employees do not accept and implement them. Resistance to new or changed regulations often comes from not understanding why they are necessary or fearing additional effort. To foster more acceptance, a clear and transparent communication is key. It must be conveyed what benefits compliance with the guidelines for the planning and construction phase has for each individual and for the entire company – whether it’s more security, better working conditions, or simply fewer mistakes. When we involve our employees in the development of company-specific guidelines for the planning and construction phase guidelines, it can also enhance acceptance. Positive incentives for particularly safety-conscious behavior or for good suggestions for improvement can further motivate.

Everyone at one table: Software as a bridge builder for improved communication

On construction projects, so many different trades and companies work together. There are interface problems and communication gaps unfortunately often the order of the day, leading to mistakes, delays, and misunderstandings. Information gets lost, responsibilities are unclear, or decisions are not made in time. Modern project management software and collaboration platforms can work wonders here. Such systems provide everyone with central access to important project data, make task tracking transparent, and enable direct communication among all parties involved. Our solution at Valoon GmbH addresses this directly: For example, we transform everyday messenger communication into structured project data, thereby optimizing the information flow between field personnel and the office. This is our contribution to guidelines for the planning and construction phase effective project management.At Valoon, we make your project management and communication in construction easier

The construction industry is fast-paced, and we all agree on that. Efficient project management and communication that flows smoothly are essential for success. This is where we at Valoon GmbH come in: We have made it our mission to optimize these areas for you. Our cloud-based SaaS platform has been specifically designed to support you in tackling the challenges associated with implementing guidelines for the planning and construction phase construction projects. How? By making data collection and processing super simple and significantly improving the information flow between your field staff and the office. We understand that in traditional industries like construction, new technologies can sometimes pose a challenge. Therefore, we focus on maximum simplicity and user-friendliness.This keeps training effort low and ensures that our solution quickly integrates into your usual workflows, especially when using guidelines for the planning and construction phase.

our platform.

What our platform can do: From WhatsApp directly into your structured project database guidelines for the planning and construction phase Our software is packed with features that make your project work easier and support you in maintaining your standards. A key feature is theYour field staff can continue to use their familiar tools to send information, photos, or voice messages. These are then automatically organized within our platform and assigned to the correct projects and tasks. But that’s not all: A central task management system, intelligent reporting (for example, for photo documentation, measurements, or daily reports), a cloud-based project archive, and automatic translation into over 50 languages (super handy for international teams!) are also included. We have made the integration of WhatsApp, Telegram, and MS Teams even smarter with enhanced functions like buttons, lists, and forms, making data entry even more efficient.Through an API and a web application, your office staff then has access to all structured information and can utilize comprehensive project management functions that support compliance with the guidelines for the planning and construction phase regulations.

What sets us apart: Perhaps the simplest project management software in the world

What distinguishes Valoon from other providers? Clearly, our consistent focus on simplicity and the seamless integration of communication tools you already use every day.. Our promise to you, our Unique Value Proposition, is: We offer one of the “easiest project management software in the world.” We take the often unstructured messenger communication that is simply part of everyday construction life and transform it into valuable, structured project data that is guidelines for the planning and construction phase relevant. With this, we are combating information overload and making extensive software training unnecessary – especially for your field staff. This approach significantly lowers the barriers to digitization and helps companies like yours fully exploit the advantages of modern technologies, even in the context of guidelines for the planning and construction phase, without having to give up your established communication channels. This makes compliance and documentation of guidelines for the planning and construction phase child’s play and super efficient.

Who we are here for: Our focus is on construction, trades, and facility management

Our solutions are primarily designed for B2B companies in the construction industry, trades, property management, maintenance & service, and facility management . Companies with many employees in the field or at different locations especially benefit from our approach. So if you’re looking for a simple and efficient solution to optimize your communication and data processing processes and improve the compliance of your guidelines for the planning and construction phase you are exactly right with Valoon. We help you close the gap between the work on-site and the organization in the office and make your projects in line with the guidelines for the planning and construction phase more successful. Our cloud-based construction management software from Valoon is the perfect tool for that.From practice for practice: How guidelines work – success stories and tips

Theory is good, practice is better! That guidelines for the planning and construction phase are important, we do not need to argue about that. But it is only when they are successfully applied in practice that they show their full potential. Using concrete projects, we can see how thoughtful guidelines for the planning and construction phase, combined with the right tools, lead to measurable improvements. These case studies show not only the positive effects on safety, efficiency, and quality, but also give us valuable tips and recommendations for future projects. They prove: The investment in the development and implementation of such guidelines for the planning and construction phase pays off sustainably and makes the entire construction process more professional. Documenting such successes is also an important part of a effective construction management..

This is what it looks like in practice

Imagine a medium-sized construction company. They were constantly having trouble with incomplete daily reports and patchy photo documentation of their construction sites. The result? Misunderstandings with clients and more challenging recalculations. Then they implemented clear guidelines for the planning and construction phase for documentation requirements and simultaneously adopted a software solution like Valoon. With this, employees could easily send reports and photos via WhatsApp. And lo and behold: The situation improved significantly! By the standardized data collection directly on-site the data was suddenly complete and up to date. Or take a general contractor: By consistently applying the GDA guidelines as part of the guidelines for the planning and construction phase and employing a dedicated safety coordinator, he could significantly reduce accident rates on his large construction sites. This not only prevented human suffering but also saved costs for downtime.

What it really brings: More safety, efficiency, and quality

When we guidelines for the planning and construction phase apply consistently, it triggers a whole chain of positive effects. Increased safety is often the main goal, especially in accordance with guidelines for the planning and construction phase such as the Construction Site Regulation or the GDA guidelines. Fewer accidents mean less downtime and lower insurance and follow-up costs – logically. At the same time, the efficiency: Clear process guidelines, as demanded in the BNB criteria for integrated planning teams or in the use of BIM, reduce friction, minimize rework, and optimize the use of our resources. We feel this directly in shorter project durations and lower costs. And last but not least, the quality of our construction execution improves when we consistently adhere to technical standards and our own quality standards. The result: happier customers and a better reputation in the market. A good checklist for the construction phase can support us tremendously.

What we learn from this: Tips and recommendations for you

We can learn a lot from successful projects. One very important insight is often: The early and continuous communication der guidelines for the planning and construction phase to all involved is crucial for them to be accepted and implemented. Training must be practice-oriented and make clear to everyone what they stand to gain from it. It also repeatedly shows that the choice of the right tools, such as a user-friendly project management software, can significantly facilitate compliance with guidelines for the planning and construction phase . Our recommendations for your future projects are therefore often: Clearly define responsibilities, establish regular feedback rounds to adjust the guidelines for the planning and construction phase and foster a culture where safety and quality are viewed as a shared responsibility. Investing in digital tools that improve the flow of information – just like our solution at Valoon – pays off quickly.Looking ahead: How digitization, BIM, and sustainability are changing our construction sites

Our construction industry is currently undergoing significant changes! Technological innovations, growing environmental awareness, and the desire for more efficiency are bringing fresh wind and new approaches. These trends are also mixing up the guidelines for the planning and construction phase – they must constantly evolve to stay fit for the future. Digitization is a true engine that opens up entirely new possibilities for planning, execution, and operation of buildings that require new guidelines for the planning and construction phase standards. Companies that keep track of these developments early and incorporate them into their strategies will stay on track long-term. Adapting to these trends is super important so that our guidelines for the planning and construction phase remain relevant tomorrow.

Digitization and automation: The turbo for more efficiency in construction

Digitization is conquering all areas of construction and has enormous potential to make us more efficient and better. From digital planning creation to using drones for construction progress control to automated invoice verification – the possibilities are truly diverse. Mobile applications for the construction site, as offered by Valoon, enable direct data collection and real-time communication. Future guidelines for the planning and construction phase will need to take digital processes and data formats into even greater account. Automation, for instance through construction robots or AI-supported analysis tools, will also become increasingly important and create new requirements for the know-how of our employees and the design of our workflows in the context of the guidelines for the planning and construction phase make. The digital construction site is a key concept here.

BIM and Building Lifecycle Management: The building as a digital twin

Building Information Modeling (BIM) is already almost standard when it comes to the digital planning and management of construction projects. With BIM, we can create a digital twin of our building that contains all important information over the entire lifecycle – from the initial idea through planning and execution to operation, maintenance, and eventually also deconstruction. Future guidelines for the planning and construction phase will see BIM as a central method and set standards for data exchange and collaboration in the context of the guidelines for the planning and construction phase . Building Lifecycle Management (BLM) takes it a step further and places even greater emphasis on the long-term use and management of buildings. This requires a close linking of planning, construction, and operational data, which is supported by modern software for construction planning and execution .

Sustainable construction in a circular economy: Our responsibility for tomorrow

The topic of sustainability will strongly shape the construction industry in the coming years. In light of climate change and scarce resources, energy-efficient construction methods, the use of environmentally friendly materials, and the ideas of the circular economy are increasingly coming to the forefront. Future guidelines for the planning and construction phase will impose even stricter requirements on the energy balance of buildings, promote the use of recycled building materials, and demand concepts for the deconstruction and reuse of components. The cultural guidelines of the federal government, mentioned in the research input and focusing on renovation culture and land-saving, already point in this direction. The consideration of life cycle costs, as provided by the BNB system, is becoming standard so that we can make not only ecologically but also economically sustainable decisions within our guidelines for the planning and construction phase meet.

  • Digital transformation: Comprehensive use of digital tools for process optimization.
  • Artificial Intelligence (AI): Use of AI for predictive analysis, resource planning, and quality control.
  • Modular construction and prefabrication: Increasing efficiency and quality through industrial prefabrication of building elements.
  • Green technologies: Increased use of renewable energies and eco-friendly construction materials.
  • Resilience and adaptability: Planning buildings that are resilient to climate change and other external influences.

Together to success: How guidelines strengthen your construction projects – today and tomorrow

For construction projects to truly succeed, it is crucial how well and consistently we guidelines for the planning and construction phase apply. They are the backbone for safe, efficient, and high-quality construction processes – we are sure of that. As we have seen in this article, there is a whole range: from legal minimum requirements to technical standards to our very own, company-specific guidelines that serve as specific guidelines for the planning and construction phase guidelines. They all help us manage complexity and minimize risks. The real challenge, however, is not just knowing all these requirements. It is primarily about integrating them firmly into our daily work and continually adapting them to new developments. We at Valoon GmbH want to support you in optimizing your communication and project management processes so that you can implement your guidelines for the planning and construction phase effectively. Discover with us how our solutions can help you bring your projects onto the path to success!

The most important points summarized for you again

These guidelines for the planning and construction phase are simply indispensable tools for us in construction . They ensure that we comply with legal requirements (think of the Construction Site Regulation or the EKrG), promote workplace safety (like the GDA guidelines), support sustainable construction (BNB criteria, cultural construction guidelines), and make efficient project execution possible. When we deal with specific technical guidelines, such as those from Amprion for network expansion, we see how much know-how is behind it. With company-specific guidelines, we can tailor everything to our individual needs and establish a culture of continuous improvement. Challenges such as complex requirements, lack of acceptance, or communication gaps can be mastered with expert knowledge, transparent communication, and modern software solutions like our. Sie sorgen dafür, dass wir gesetzliche Vorgaben einhalten (denken Sie an die BaustellV oder das EKrG), sie fördern die Arbeitssicherheit (wie die GDA-Leitlinie), unterstützen nachhaltiges Bauen (BNB-Kriterien, Baukulturelle Leitlinien) und machen eine effiziente Projektabwicklung erst möglich. Wenn wir uns mit spezifischen technischen Richtlinien beschäftigen, wie denen von Amprion für den Netzausbau, sehen wir, wie viel Know-how dahintersteckt. Mit unternehmensspezifischen Leitlinien können wir alles auf unsere individuellen Bedürfnisse zuschneiden und eine Kultur der kontinuierlichen Verbesserung etablieren. Herausforderungen wie komplexe Anforderungen, mangelnde Akzeptanz oder Kommunikationslücken können wir mit Expertenwissen, transparenter Kommunikation und modernen Softwarelösungen wie unserer project management software from Valoon. The future? It will be shaped by digitization, BIM, and a stronger focus on sustainability. This means we must constantly guidelines for the planning and construction phase evolve.

Our appeal to you: Bring guidelines to life and shape them!

The success of guidelines for the planning and construction phase is in all our hands. Therefore, we want to appeal to everyone – builders, planners, executing companies, and every single employee: Do not see these guidelines for the planning and construction phase as a pesky bureaucratic hurdle, but as a real opportunity to do things better! Actively live the guidelines in your daily actions and contribute with your commitment to more safety, quality, and efficiency on our construction sites. Get involved when it comes to the development of internal standards, and share your experiences. Only when we all pull together and everyone shows a high degree of responsibility can we overcome the challenges of the construction industry and create structures that are future-proof. The consistent application and continuous optimization of the guidelines for the planning and construction phase is the key to that.

A look ahead: Let us shape the future of planning and building together!

The construction industry is facing incredibly exciting developments. Digitization, new materials and construction methods, as well as the growing demand for sustainability will fundamentally change how we plan and build. This change offers huge opportunities! But it also requires us to be willing to explore new avenues and critically question and adjust existing guidelines for the planning and construction phase again and again. Companies like ours at Valoon GmbH contribute with innovative solutions to shape this change and leverage the potentials of digitization for a more efficient and transparent construction industry. Invest in the future of your projects by relying on clear guidelines and modern tools. Now is the perfect time to find out where you can still optimize your construction endeavors. Contact us today for personalized consulting. We are happy to show you how Valoon can help you implement your guidelines for the planning and construction phase successfully and take your projects to a whole new level.

Why are guidelines so important for the planning and construction phase?

Guidelines are crucial because they clear structures and processes create a foundation for construction projects. They ensure more efficiency, higher safety on the construction site and help to significantly minimize risks, errors, delays, and costs..

What central legal guidelines do I need to consider in Germany?

The most important include the Construction Site Regulation (BaustellV), which regulates responsibilities such as safety coordination, the respective State building codes (LBO) and specific laws like the Railway Crossing Act (EKrG) for relevant projects. Also, DIN standards are often contractually binding.

How can I ensure that my team truly implements the guidelines?

A clear communication of the benefits, regular trainings and continued education are essential. Involve your employees in developing company-specific guidelines and use positive incentives as well as active quality management for continuous improvement.

Can digital tools simplify compliance with guidelines?

Yes, absolutely. Modern project management software and collaboration platforms like Valoon can optimize the flow of information, simplify the data collection on-site (e.g., via messenger) and make the task tracking transparent, which significantly facilitates the implementation of guidelines.

What additional benefits do company-specific guidelines offer compared to laws?

Company-specific guidelines allow you to tailor processes exactly to your own needs, experiences, and risk profiles.They define internal quality standards, can increase efficiency, and ensure a uniform working method throughout the entire company. How do guidelines contribute to more sustainability in construction?

Wie tragen Leitlinien zu mehr Nachhaltigkeit im Bauwesen bei?

Guidelines such as the BNB criteria or the cultural construction guidelines of the federal government promote sustainable construction. They focus on life cycle cost assessment, energy efficiency, the use of renewable energies, material selection according to ecological criteria, and circular economy..

What is a safety and health coordinator (SiGeKo) and when is their appointment necessary?

A SiGeKo (Safety and Health Coordinator) must be appointed according to the Construction Site Regulation (BaustellV) when employees from multiple companies are working on a construction site. They assist the client in the coordination of occupational safety measures and prepare, among other things, the safety and health plan.

How can communication about guidelines between the office and field be improved?

Through the use of software solutions like Valoon that convert everyday messenger communication into structured project data.This simplifies digital capture on-site, ensures that information is centrally available, and sustainably improves the flow of information.