Mastering Large Projects: Your Guide to Efficient Communication & Project Management!

16. June 2025

The Major Projects Guide: Your Compass for Success and Greater Efficiency in Construction

What is behind the Major Projects Guide?

Perhaps you have already heard of the Major Projects Guide ? It is a truly crucial document, published by the Federal Ministry for Digital and Transport (BMDV), aimed at significantly optimizing the execution of large construction projects. Since its first publication on 21.03.2018, it has served as a concrete roadmap to implement the recommendations of the Reform Commission for Major Construction Projects. The big goal behind it? More cost certainty and adherence to deadlines in complex infrastructure projects, especially in the mobility sector. The guide addresses the need for a structured approach to project management and execution, building on previous insights and action plans. For us in the construction industry, this Major Projects Guide is an incredibly valuable orientation aid to navigate successful major projects and to avoid typical pitfalls. We at Valoon know these challenges all too well and are happy to support you in effectively implementing the recommendations into your practice. erfolgreiche Großprojekte zu stemmen und die typischen Fallstricke zu umschiffen. Wir bei Valoon kennen diese Herausforderungen nur zu gut und stehen Ihnen gern zur Seite, um die Empfehlungen effektiv in Ihre Praxis zu überführen.

  • Published by the Federal Ministry for Digital and Transport (BMDV) to optimize large construction projects.
  • Serves as a concrete roadmap for implementing the recommendations of the Reform Commission for Major Construction Projects.
  • Main goal: More cost certainty and adherence to timelines in complex infrastructure projects.
  • Provides a valuable orientation aid for the construction industry to avoid typical pitfalls.

When we look at the background, it becomes clear: The Major Projects Guide guide arose from the urgent need to respond to recurring issues such as cost overruns and delays in public construction projects. The Reform Commission for Major Construction Projects has uncovered various causes and developed solutions that have been directly incorporated into the Major Projects Guide guide. In collaboration with partners like KPMG Law, KPMG AG, and BUNG Ingenieure AG during its creation, a truly solid foundation has been established. So, it can be said that the Major Projects Guide guide is much more than just a collection of recommendations – it is a practical tool based on a detailed analysis of existing regulations and the development of specific action guidelines. It is primarily intended for stakeholders in mobility and infrastructure, but its principles can also be applied effectively to other large urban development projects .

Who is the Major Projects Guide targeted at? Well, the target groups are diverse: public clients, planning offices, construction companies, and basically all project stakeholders involved in the realization of large construction projects. The areas of application primarily focus on transport infrastructure projects – think of road, rail, and waterway construction, as well presented on the website of the Major Projects Guide The guide aims to help establish a uniform and improved approach to significantly increase efficiency and transparency. The relevance of such a Major Projects Guide guide is also evident in that aspects like sustainable mobility planning (SUMP/SULP) and citizen participation are becoming increasingly important and must be integrated. Even though the document from 2018 is marked as “not barrier-free,” its content remains groundbreaking for our industry. We at Valoon GmbH are happy to help you integrate the core messages of theseamlessly into your digital processes.

The core messages of the guide: How to optimize project, risk, and cost management

Der Major Projects Guide Recommends project management structures and how to successfully involve stakeholders, which, as we find particularly important, places great emphasis on clearly defined project management structures. It provides recommendations for organizational forms that enable an effective control and monitoring large project construction companies – early and continuously. The Major Projects Guide guide makes clear how important it is to find a good balance: between central control that secures overarching goals, and decentralized execution that allows flexibility and quick decisions on site. This is especially valuable in complex projects like DB Netz major projects of large construction projects. This naturally includes precise assignment of responsibilities and open, transparent communication among all stakeholders. A crucial point is stakeholder management. Here, it is about actively involving all parties involved – from authorities to residents to

  1. where many interfaces dominate daily operations. Defined project management structures:
  2. Recommendations for organizational forms for effective control and monitoring, including precise responsibilities and transparent communication. Stakeholder Management:
  3. A proactive process to identify, assess, and minimize specific risk categories in major projects. Systematic risk management:
  4. Precise cost management: Methods for cost estimation and control, dealing with uncertainties, and promoting transparency in the cost process.

Risk management is another strong pillar of the Major Projects Guideguide. Here, a systematic process is required to identify, assess, and of course minimize risks. The Major Projects Guide guide addresses specific risk categories that we frequently encounter in major projects – think of delays due to environmental regulations, lengthy approval processes, or unwanted disruptions in supply chains. A proactive risk management, as the Major Projects Guide guide prescribes, helps us all to detect potential problems early and take countermeasures. This can significantly reduce cost overruns and delays. The ability to manage risks wisely is simply a crucial factor for success and compliance with the guidelines for the planning and construction phase.

Cost management and legal frameworks – this is how you keep track

Precise cost management is essential for project success, and the Major Projects Guide rightfully devotes ample space to this topic. It presents methods for cost estimation and control aimed at utilizing financial resources as efficiently as possible and staying within budgets. The handling of uncertainties in cost forecasting – which, in long-term and complex projects, is practically a given – is also addressed, as well as promoting transparency and accountability throughout the cost management process. A solid Major Projects Guide basis is a real asset for project managers to set up the control of large projects robustly from the outset. Compliance with legal frameworks is another point that cannot be underestimated. The Major Projects Guide guide deals with relevant laws and regulations, for example, in the area of environmental impact assessments, approval processes, and public procurement. Ensuring compliance is not just a formal requirement but plays a vital role in minimizing risks and gaining acceptance for large projects.Digitalization in Focus: Effectively Utilizing BIM, PKM, and Lean Construction with the Major Projects Guide

BIM Integration: Digital models for more efficient large projects – here’s how

Der Major Projects Guide has clearly recognized the immense importance of digitalization for our modern construction industry. Building Information Modeling (BIM) plays a key role here. When we integrate BIM into major projects, as the Major Projects Guide guide suggests, it enables improved planning, execution, and later management of buildings. BIM Germany, as a central point of contact for digitalization in construction, provides important support for BIM implementation and emphasizes the importance of Open-BIM. This concretely means: using open data exchange formats like IFC (Industry Foundation Classes) to ensure interoperability between different software solutions and all project participants. The Major Projects Guide guide should therefore go hand in hand with federal BIM mandates and standards, which can be viewed on the website. The use of BIM can help us all to detect collisions early and estimate costs more accurately – an invaluable advantage for every.

project manager of major projects.

PKM and LCM: Elevating Communication and Processes to the Next Level Major Projects Guide Project Communications Management Systems (PKM) are absolutely crucial for streamlining information exchange in often complex major projects. The Major Projects Guide guide. Complementing that, Lean Construction Management (LCM) promotes the application of lean principles. Here, it is about maximizing value and minimizing waste – in all construction processes. Methods like takt planning (fixed time slots for individual trades) and visual planning boards directly on site ensure smooth processes and the timely availability of materials and plans. This fits perfectly with the idea of a – und zwar in allen Bauprozessen. Methoden wie die Taktplanung (also feste Zeitfenster für einzelne Gewerke) und visuelle Planungstafeln direkt auf der Baustelle sorgen für reibungslose Abläufe und die rechtzeitige Verfügbarkeit von Materialien und Plänen. Das passt perfekt zur Idee einer digital construction site according to the guide..

The tangible benefits of digitalization for your major projects

When we consistently utilize digital tools and methods, as discussed in the context of the Major Projects Guide we reap a number of benefits:

  • Better collaboration: BIM and PKM enable transparent and direct information exchange among everyone involved in the project.
  • Fewer errors, higher quality: Through digital models and simulations, we can identify planning errors much earlier and rectify them.
  • More efficient processes: With LCM principles, we can eliminate activities that do not add value and shorten turnaround times.
  • Cost and time savings: More precise planning and optimized workflows lead to better adherence to budgets and schedules – a core goal of the Major Projects Guide.

Challenges in Implementing the Guide: Acceptance, Data Protection, and Keeping Up to Date

Creating acceptance and overcoming implementation barriers

The successful implementation of the recommendations from the Major Projects Guide depends on the acceptance of all project participants. We know that traditionally oriented sectors like construction sometimes approach changes with skepticism. That’s why it is crucial to actively eliminate resistance and clearly and understandably communicate the benefits of new processes and technologies. Training and continuing education measures are essential here to ensure that all stakeholders understand and can apply the new methods. This concerns both the use of digital tools and the understanding of the changed processes initiated by the Major Projects Guide guide. A culture of continuous improvement and open exchange can greatly help to lower implementation barriers and breathe life into the Action Plan for Major Projects. Acceptance and Implementation:

  • Akzeptanz und Implementierung: Overcoming resistance in traditionally oriented sectors through clear communication of benefits and comprehensive training measures.
  • Data security and data protection: Ensuring the protection of sensitive project data through robust security concepts and adherence to GDPR during the digitalization process.
  • Continuous updates: Regularly adapting the guide to new technologies, legal frameworks, and practical insights to assure relevance and effectiveness.

Data security and data protection: Critical factors for success

With the increasing digitalization promoted by the Major Projects Guide – keywords BIM and PKM systems – data security and protection have gained immense importance. Protecting sensitive project data from unauthorized access, loss, or manipulation must be ensured through robust security concepts. This includes both technical measures such as encryption and access controls as well as clear organizational regulations. Compliance with the General Data Protection Regulation (GDPR) and other relevant data protection laws is not just a formality but absolutely necessary to avoid legal risks and secure the trust of project partners. A comprehensive Major Projects Guideguide, aiming to be practical, must absolutely consider these aspects.

The need for continuous updates: A guide that evolves with the times

The construction industry and information technology never stand still – they are constantly evolving. Therefore, it is incredibly important that a Major Projects Guide is not understood as a stone-carved document. It must be regularly reviewed and updated. New technologies, changing legal frameworks, or fresh practical insights must be incorporated into the Major Projects Guide to maintain its relevance and effectiveness in the long term. Taking practical feedback seriously and adapting the guide to new challenges – think of rising demands for sustainability or dealing with global supply chain disruptions – is absolutely crucial for the viability of such a Major Projects Guide guide. Only then can it serve as a reliable foundation for agile major projects. Valoon GmbH: How we simplify complex major projects with smart communicationValoon GmbH: So vereinfachen wir komplexe Großprojekte mit smarter Kommunikation

How Valoon perfectly complements the Major Projects Guide

At Valoon GmbH, we have made it our mission to revolutionize communication and project management, especially in the construction industry. Our software complements the principles of the Major Projects Guide in our view ideally, simplifying data collection and processing radically. A core element of our solution is the seamless integration of popular messaging services like WhatsApp. What does this mean for you? Your field staff can send information directly from the construction site using tools they already know and use daily. These often unstructured data – whether photos, voice messages, or short text info – are automatically structured by our platform and converted into valuable, usable project data. This optimizes the flow of information between field and office sustainably, aligning perfectly with the goals of the. Ein Herzstück unserer Lösung ist die nahtlose Integration gängiger Messenger-Dienste wie WhatsApp. Was bedeutet das für Sie? Ihre Außendienstmitarbeiter können Informationen direkt von der Baustelle über Werkzeuge übermitteln, die sie bereits kennen und täglich nutzen. Diese oft unstrukturierten Daten – seien es Fotos, Sprachnachrichten oder kurze Textinfos – werden durch unsere Plattform automatisch strukturiert und in wertvolle, verwertbare Projektdaten umgewandelt. So optimieren wir den Informationsfluss zwischen Außendienst und Büro nachhaltig, was genau den Zielen des Major Projects Guide to increase efficiency.

Der Major Projects Guide aims to standardize processes and increase transparency. This is where Valoon comes in, supporting you with centralized task management and intelligent reporting. Photo documentation, measurements, and daily reports can be easily created and securely stored in a cloud-based project repository. Another advantage of our solution, which is often highly valued, is the automatic translation into over 50 languages.This immensely eases collaboration in international project teams or with foreign-speaking workers. We want to keep the barriers to entry for digitalization as low as possible by consistently focusing on user-friendliness and minimizing training effort – an important aspect to promote the acceptance of new methods, as advocated by the Major Projects Guide guide.

Your specific advantages with Valoon for major projects

When you use our software in the context of major projects aligned with the Major Projects Guide you will gain very concrete advantages:

  • Significant time savings: By directly collecting data via messenger and automatically structuring it, the double entry of information becomes a thing of the past. This speeds up your processes and gives your project managers for major projects more freedom for truly essential tasks.
  • Reduction of errors and misunderstandings: Clear, documented communication and standardized reports minimize the risk of misinterpretations and the resulting often costly mistakes.
  • Improved transparency and traceability: All relevant project information is centrally available and thoroughly documented. This not only facilitates the control of large projectsbut also adherence to the requirements of the Major Projects Guide.
  • Increasing efficiency in the field: Your employees can report directly from the construction site without additional, complex software. This not only increases productivity but also the acceptance of digital tools.

From practice: How the Major Projects Guide and Valoon succeed together

The guide in action: Success factors and typical challenges

The practical application of the Major Projects Guide has already impressively led to positive results in various infrastructure and construction projects. What often characterizes successful projects? Usually, it is the consistent implementation of the recommendations from the Major Projects Guide. This includes the early involvement of all stakeholders, a truly robust risk management and the use of digital planning tools such as BIM. When we take a closer look at such projects, it becomes clear: A clear structure and transparent communication channels, as advocated by the Major Projects Guide are absolutely crucial for keeping to cost and time schedules. The challenges often lie in leaving established but less efficient working methods behind and ensuring that all participants bring the necessary digital skills. The

guide provides an important and helpful basis for this.

Valoon in practical test: How we increase efficiency in construction and infrastructure projects large project construction companiescompany: Before implementing Valoon, the company struggled with a flood of unstructured information via WhatsApp and email. This led, as often, to delays and misunderstandings. By using Valoon, the company was able to standardize the collection of construction site data and integrate it directly into the project management system. The field staff were thrilled with the ease of use through WhatsApp, while the project management in the office benefited from structured reports and thorough documentation. The result? A measurable reduction in administrative effort and significantly improved traceability – very much in line with the objectives of the Major Projects Guide.

Measurable results and enthusiastic customer feedback

The implementation of Valoon leads to very concrete, measurable improvements. Our clients report a reduction in report creation time of up to 50% and a significant decrease in errors that can arise from poor communication. For example, a facility management company was able to reduce response times for disturbances by an impressive 30% because information from the site was sent directly and structured to the responsible technicians. A project manager of a major project in civil engineering put it succinctly: “Since we started using Valoon, documenting defects and construction progress has become much easier and faster. The automatic linking of photos and notes with the respective project tasks saves us an enormous amount of time and brings clarity.” Such successes show us how Valoon translates the principles of the Major Projects Guide into practice and significantly increases efficiency.Looking ahead: Trends in project management and the future of the Major Projects Guide

What is currently influencing project management for major projects?

Project management for major projects is constantly evolving, driven by new technologies and changing requirements. One important trend is the growing importance of data analysis and artificial intelligence (AI). With these, we can better predict risks and optimize planning and construction processes. Also, sustainability is becoming increasingly central: resource conservation, the use of environmentally friendly materials, and minimizing the carbon footprint are becoming decisive criteria for erfolgreiche Großprojekte. The Major Projects Guide guide must, of course, capture such developments to remain relevant. Agile methods, originally from software development, are also gaining traction in construction to respond more flexibly to changes and improve collaboration within interdisciplinary teams. Integrating these trends into an updated Major Projects Guide guide is absolutely essential for the sustainability of our industry.

Why the guide must constantly evolve

To retain its relevance and effectiveness, it is essential to regularly adapt the Major Projects Guide to new challenges and technological advances. This also means taking the practical feedback of large project construction companies and other stakeholders seriously and incorporating it. Topics like cybersecurity for connected construction sites, integrating smart city concepts into large urban development projects or the ongoing digitalization of the entire construction value chain require continuous reflection and adjustment of guidelines. A dynamic Major Projects Guide, understood as a living, breathing document, can significantly contribute to positioning the German construction industry strongly in international competition and sustainably ensuring the quality of major projects. The insights from the original

guide provide a solid and valuable basis for this.

The Role of Valoon for Tomorrow’s Project Management At Valoon, we see ourselves as your partner for the future of project management – in the construction industry and beyond. Our platform is designed to respond flexibly to new demands Major Projects Guide and seamlessly integrate technological innovations. We are tirelessly working to expand our software with intelligent features that, for example, enable automated analysis of construction site data or improve integration with other planning and management tools. By making communication and data collection as simple and efficient as possible, we help companies optimally leverage the potentials of new methods and technologies that will also play a role in future versions of the guide. We actively and passionately support the vision of a fully Major Projects Guide anstrebt, unterstützen wir mit unseren Lösungen aktiv und voller Überzeugung.digital construction site as aspired to by the

Our conclusion: The guide as a strong foundation, Valoon as your efficiency booster for major projects

Der Major Projects Guide The BMDV’s guide is, we are confident, an indispensable foundation for the successful planning and execution of complex construction projects. It addresses critical aspects such as project management structures, risk and cost management, and the necessity of digitization through BIM and PKM. When its recommendations are consistently applied, it greatly helps to minimize cost overruns and delays and improve the overall quality of major projects. We know the challenges in implementation: They often lie in the acceptance of new processes and ensuring data security. An up-to-date and practical Major Projects Guide guide is therefore of great importance. Digitalization, particularly through tools that optimize information flow, plays an absolutely key role in achieving the goals of the Major Projects Guide .

Wir bei Valoon GmbH bieten Ihnen mit unserer Software eine Lösung, die den Major Projects Guide We at Valoon GmbH offer you a solution that optimally complements the and significantly facilitates its implementation in practice. Through the like WhatsApp into structured project data, we eliminate information silos and drastically reduce the administrative burden for your field staff. Our platform fosters transparent communication, improves data collection, and boosts efficiency throughout the project process. The user-friendly interface and automatic structuring of unstructured communication make Valoon a valuable tool for any company that aims to master its major projects according to the principles of the Major Projects Guide successfully. The combination of the strategic guidelines from the Major Projects Guide and the operational benefits of our software creates a truly solid foundation for your project success.

Our recommendations for your next major projects

The successful execution of large projects requires a clever strategic approach and the use of the right tools. Our advice: Use the Major Projects Guide as a guideline for your project structures and processes. Implement digital solutions like Valoon to optimize the communication and data collection and thus increase efficiency. Invest in training your employees and foster a culture of continuous improvement. Remember: Early and consistent digitization not only saves costs but also sustainably improves the quality and transparency of your projects. The Major Projects Guide shows you the way, and with the right partners and technologies, you can successfully walk this path.

Optimizing your communication and project management processes is a crucial step in overcoming the challenges of large projects and effectively implementing the requirements of the Major Projects Guide . Valoon offers you a simple yet incredibly powerful solution that seamlessly integrates into your existing workflows and optimally supports your field staff. Do you want to learn how our software can simplify and accelerate your projects? Then don’t hesitate to contact us. We are happy to advise you and show you how to fully leverage the potential of digitization. Start now and make your large projects even more successful! For personalized advice and to learn more about our solutions, contact us today.

What is the Large Projects Guideline, and why is it important for my construction projects?

Der Major Projects Guide is a document published by the Federal Ministry for Digital and Transport (BMDV), aimed at optimizing the execution of substantial construction projects. It provides concrete action instructions to improve cost certainty and adherence to deadlines , based on the recommendations of the Reform Commission for Large Project Construction.

How does the guideline address typical issues in large projects such as cost overruns?

The guideline recommends structured project management methods, a proactive risk management und precise cost control mechanisms. It emphasizes the importance of transparency and clearly defined responsibilities to address cost overruns and delays at an early stage.

What role does digitization, e.g., BIM, play in the context of the guideline?

Digitization is a core element. The guideline supports the use of Building Information Modeling (BIM) for better planning and execution, Project Communication Management Systems (PKM) for efficient information exchange and Lean Construction Management (LCM) for process optimization. This aims to increase efficiency and quality in large projects.

My field staff mainly uses WhatsApp. How does that fit with the guidelines’ requirements for better project management?

Very well! Valoon enables the seamless integration of WhatsApp and other messengers. Your field staff can continue using familiar tools to send data directly from the construction site. Valoon automatically organizes this information and makes it usable for project management, simplifying data collection according to the guideline.

How can I improve the flow of information between the construction site and the office as recommended by the guideline?

Valoon enhances the flow of information by creating a direct and simple communication bridge between field staff and the office. Data captured via messenger is centralized, structured, and available in real-time for the office team. This reduces misunderstandings and accelerates decision-making processes.

What are the concrete benefits of implementing the guideline’s recommendations with a tool like Valoon?

You benefit from significant time savings in data collection and reporting, a reduction of errors through clear communication, improved transparency and traceability, as well as a higher acceptance of digital tools within the team, as familiar messengers can be used.

Is the Large Projects Guideline relevant only for huge public infrastructure projects?

Although the focus is often on large public projects, the principles of the guideline are also scalable and valuable for private large projects and complex construction projects of various sizes. It is about efficient and structured project management, which is relevant across industries.

How does Valoon help reduce the administrative burden of project documentation according to the guideline?

Valoon automates the structuring of information sent via messengers (e.g., photos, notes, voice messages) and converts it into usable project data. This eliminates manual duplication of entries and simplifies the creation of daily reports, photo documentation, and measurements, significantly reducing the administrative burden..