Large projects failing? Here’s how to avoid chaos on the construction site!

16. June 2025

Major projects in crisis? Why they often fail and how we can counteract it at Valoon

Section 01 – Introduction: Why Major Projects Fail and What We Can Do About It

It’s a harsh truth, but one we must face: major projects fail far too often. This burdens not only public finances, but we all feel it in one way or another. Looking at studies such as those from the _, it’s almost dizzying: average cost increases of 73% for public infrastructure projects! These figures clearly illustrate that the problem of major projects failing, is not a small one, but rather entails immense economic costs. And often it’s not just about money – think of the lost trust and missed opportunities! The reasons for this are manifold, ranging from poor planning to serious communication breakdowns. But don’t worry, we’re not just going to highlight problems here. In this article, we dive deep into why so many major projects failing and, more importantly, how you can secure the success of your projects with the right strategies and clever tools – particularly through the smart integration of messenger services. We at Valoon GmbH firmly believe: transforming everyday messenger communication into structured, usable project data is a true key to boosting efficiency. This can significantly help to ensure that fewer major projects failing. Join us in discovering how to avoid costly mistakes and unnecessary friction.

  • Major projects frequently fail, leading to high costs and loss of trust.
  • The causes are diverse, ranging from poor planning to communication mishaps.
  • Valoon GmbH offers solutions by transforming messenger communication into structured project data.
  • The aim of the article is to illustrate strategies and tools for ensuring project success.

The question “” occupies experts worldwide. According to a survey by the Project Management Institute, a staggering 12% of projects are considered failures. The impacts extend far beyond direct financial losses; they also include significant reputational damage and demotivation of the involved teams, which is completely understandable. The complexity of modern construction projects and other major initiatives simply requires a paradigm shift in project management. Today, it’s no longer sufficient to rely on traditional methods when communication pathways and data flows are becoming increasingly convoluted and chaotic. Valoon GmbH specifically addresses this. We want to offer you a solution for the challenges that often lead to major projects failing. Our approach aims to channel the flood of information and make it genuinely usable, so that your next project does not end up being one that major projects failing slips by.System traps: How bureaucracy & co. slow down major projects

Section 02 – The Causes of Failure: A Systemic Perspective

Let’s take a closer look at why major projects failing – often the causes are rooted deeper in the system than one might suspect at first glance. Especially in Germany, we know this well: complicated approval processes, a true planning chaos, and lengthy court proceedings. All of this leads to significant delays and cost overruns that leave you pulling your hair out. Compared to other European countries, Germany sometimes lags a bit behind in infrastructure development, partly due to these bureaucratic hurdles. These systemic problems create an environment in which project managers find it extremely difficult to adhere to schedules and budgets. And the result? Exactly, major projects failing. An optimization of construction planning and strategies is absolutely essential here.

  1. The causes of major project failures are often deeply embedded in the system.
  2. In Germany, complicated approval processes, planning chaos, and lengthy court proceedings contribute to issues.
  3. These systemic hurdles lead to significant delays and cost overruns.
  4. An optimization of construction planning and strategies is crucial to counteract these problems.

Federalism and conflicts of interest as barriers

Our German federalism, as valuable as it is for regional diversity, honestly also contributes to the fact that major projects failing. Different competencies and unique economic and ecological interests at the state and local levels often lead to a patchwork of regulations and tedious coordination processes. When partially privatized organizations are involved in the infrastructure sector, the landscape becomes even more complex. These conflicts of interest can block projects or at least considerably delay them, which naturally increases the likelihood that ultimately major projects failing. It’s a vicious cycle that leads to repeatedly major projects failing. A clear guide for major projects could really help to standardize and streamline processes.

Lack of transparency and insufficient public participation

Another significant factor that often contributes to major projects failing, is the lack of transparency even in the planning phase and a citizen participation that often falls short or occurs too late. This often leads to resistance in the population and acceptance issues that can significantly delay or even completely prevent projects. A more professional and, above all, earlier involvement of the public is urgently needed to build trust and work together on solutions. Without this acceptance, the risk simply increases that even well-planned major projects failing. The challenges in construction are indeed manifold and require open, honest communication.

The slow adoption of Building Information Modeling (BIM)

However, there are promising digital planning methods like Building Information Modeling (BIM) that can truly help to increase efficiency and transparency in construction projects, thereby preventing that major projects failing. BIM allows for a holistic visualization and seamless collaboration of all project participants – sounds great, right? Nevertheless, the implementation of BIM in Germany is unfortunately still somewhat sluggish compared to other countries. This hesitant adoption of modern technologies is another reason why many major projects failing, as valuable potentials for error prevention and cost control simply remain untapped. Effective controlling for major projects is hardly conceivable today without modern tools.Rigid giants: Why monolithic project structures are so dangerous

Section 03 – The Monolithic Approach as a Risk Factor

Do you know that feeling? Traditional major projects often resemble a huge, rigid block – a so-called monolithic approach. This creates a tightly coupled system where processes are heavily dependent on one another. This high interdependence makes projects extremely vulnerable: even small issues, like the notorious defective fire doors at the BER airport, can bring the entire project to a halt and lead to massive delays and cost explosions, which explains why so often major projects failing. This very rigidity is a main reason why so many major projects failing. A paradigm shift toward more flexibility and agility is urgently needed to increase the success rate and prevent further major projects failing.

The “All or Nothing” Dilemma of Monolithic Projects

A core problem of these monolithic projects is often the “all or nothing” principle. The actual value is typically only delivered at 100% completion. Partial completion often provides no immediate benefit, making delays particularly painful. Imagine a project is 95% complete, but the last critical steps can no longer be realized due to budget exhaustion or insolvable issues – then the whole project could be worthless. This scenario dramatically illustrates why major projects failing, when they are unable to deliver value early and incrementally, step by step. The risk that major projects failing, therefore increases enormously. The financing of major projects is of course further complicated by such risks.

Tesla Gigafactory: Modular Approaches as a Success Model

The Tesla Gigafactory project in Nevada shows that it can be done differently. It stands in stark contrast to many failed major projects and suggests the enormous benefits of a more modular approach. Although the exact modularization techniques are not detailed in the cited text, the success – completion on time and within budget – speaks volumes: modularity was a key success factor here . By breaking down the overall project into smaller, independent, or at least loosely coupled modules, the risk that major projects failing, can be significantly reduced, as not every disturbance leads to complete major projects failing. Such agile approaches in major projects enable incremental value creation and much better adaptability to unforeseen challenges.

Dependency analysis for risk minimization

A critical aspect that often leads to major projects failing, is the underestimation and poor management of process dependencies. A careful dependency analysis is essential to truly understand how various project parts are linked and what cascading effects can occur when problems arise. Modular project approaches help reduce these dependencies or at least manage them better by defining clear interfaces between the modules. This is an important building block for successful major projects and a core aspect of risk management , which cannot be started too early.IT projects under scrutiny: Special hurdles and clever solutions

Section 04 – IT Major Projects: A Special Challenge

IT major projects, often equipped with budgets over 10 million euros and durations of more than a year, unfortunately have a disproportionately high failure rate, despite being strategically incredibly relevant. A core problem we encounter repeatedly is that clients are repeatedly confronted with the same issues without learning from them and implementing preventive measures. The IT department often has to demand more time, more money, or a reduction in scope – a clear indication of systemic deficiencies in planning, execution, or even at the initial goal-setting stage. These recurring patterns are a clear sign of why especially technology-intensive major projects failing and an adjustment of procedures is urgently needed to prevent future major projects failing. An interesting study from _ highlights that often indirect costs, such as reputational damage, are simply overlooked.

  • IT major projects have a high failure rate despite their strategic importance.
  • A frequent problem is the repeated confrontation with the same difficulties without learning effects or preventive measures.
  • Systemic deficiencies in planning, execution, and goal setting are often the cause of failure.
  • Indirect costs, such as reputational damage, are often not taken into account in IT projects.

Causes of IT project failures

The reasons why IT-major projects failing, are diverse and often a combination of several factors that lead to major projects failing. These typically include:

  • Planning mistakes: Here we often see unclear requirements, miscalculations regarding resources, and a massive underestimation of risks.
  • Operational weaknesses: This ranges from poor coordination over inefficient processes to a lack of quality control during implementation.
  • External influences: Changing market conditions, new technological developments, or regulatory adjustments that were not adequately considered can quickly destabilize a project.

Especially the lack of transparency in the planning phase leads to unrealistic timelines and cost estimates, which massively increases the likelihood that these major projects failing. Modern tools and proactive project management and controlling are absolutely critical to success.

Importance of stakeholder management and resource planning

When the interests of stakeholders – be they investors, future users, or key contractors – are neglected, it inevitably leads to conflicts and often very costly rework. An early and continuous involvement of all parties through workshops and transparent decision-making processes is therefore essential to prevent that major projects failing. Equally critical is a detailed and realistic resource planning. Inadequate planning of personnel, materials, and technical infrastructure quickly causes delays and cost overruns, often leading to major projects failing. Digital management tools and buffer times are necessary to ensure that not even these major projects failing.

Communication strategies and proactive risk management

Inaccurate or delayed information transfer between planners, developers, and users almost inevitably leads to errors and rework. Too many interfaces additionally increase the risk of misunderstandings. Clear communication structures, regular meetings, and transparent reports are therefore absolutely vital to avoid misunderstandings and delays that can result in major projects failing. A flexible risk management approach that encompasses identification, assessment, development of countermeasures, and continuous monitoring of potential risks is also necessary to minimize the likelihood that IT- major projects failing. The project manager for major projects naturally plays a key role here and carries immense responsibility.The Human Factor: How to Master Social Complexity for Project Success

Section 05 – Social Complexity: The Oft-Underestimated Factor

Did you know, major projects often do not fail due to technical challenges, no matter how complex they may be, but rather due to the neglect of social complexity . Aspects such as leadership, team development, communication, and stakeholder management are often underestimated or taken for granted in technically oriented organizations. Yet, precisely these “soft” factors are absolutely critical to whether a project is successful or whether it too major projects failing. A clear distribution of roles and precise alignment of the competencies of all project members – from the project assistant to the sub-project leader – is fundamental. If skills and responsibilities do not perfectly align, the risk simply increases that major projects failing, and this is a common reason why major projects failing.

Structured team development and clear communication channels

The development of a truly high-performing team is not a coincidence but a structured process , that must be actively managed and accompanied. Models like Tuckman’s phases (Forming, Storming, Norming, Performing) can help better understand and steer team development. The leader must define and model values, norms, and rules to establish a positive and productive team culture. Equally important is designing an effective communication structure. Both horizontal and vertical communication channels must be implemented, and clear agreements on participants, frequency, duration, and content of communication made. The integration of agile formats such as daily stand-up meetings and regular retrospectives can significantly improve communication and actively contribute to ensuring that fewer major projects failing; poor communication is often a reason why major projects failing.

Synergy between line and project organization

The line organization and the project organization should be viewed as complementary, i.e., they should complement each other and not be contradictory. This is a very important point! While the project organization is responsible for scope, schedules, and costs, the line organization controls resource allocation, methodologies, and technical approvals. Deficiencies in the underlying business processes , for example, in production or product development, often significantly increase the management effort in the project due to increased coordination needs. Continuous process improvement is therefore also crucial for project success to prevent that major projects failing. A good guide for major projects naturally takes these dynamic aspects into account.

Proactive management of stakeholder relationships

Proactively managing relationships with internal and external stakeholders is another critical success factor that cannot be overestimated. It’s important to identify their needs and expectations early and respond to them promptly and adequately. Stakeholder management tools can help track interactions and systematically plan measures. Without such a systematic approach, conflicts can quickly arise, leading to major projects failing. It’s an avoidable reason why major projects failing. Comprehensive project controlling that goes far beyond mere cost monitoring is also necessary to identify deviations early and initiate timely corrective measures. This is an important part of how to successful major projects realize and not just dream about it.Valoon in action: Your solution for effortless communication in major projects

Section 06 – Valoon GmbH: The Solution for Efficient Project Management

Given the diverse and often frustrating reasons why major projects failing, we at Valoon GmbH have developed a solution that directly addresses the critical points: communication and data management. Our vision is to provide one of the easiest project management software in the world . And how do we achieve this? By transforming everyday messenger communication, for example via WhatsApp, Telegram, or MS Teams, into structured and truly usable project data. This eliminates the annoying information overload and the need for complex software training, especially for your valuable field staff. In this way, we actively help you to prevent that your major projects failing, because we know how frustrating it is when major projects failing.

Core functionalities of the Valoon platform for your project success

Our cloud-based SaaS platform is specifically designed to optimize communication and project management in industries such as construction but also beyond. It offers a range of core features aimed at increasing efficiency and minimizing the risk that major projects failing:

  • Digital data collection on-site via messenger: Your field staff can use familiar services like WhatsApp, Telegram, or MS Teams to transmit data directly from the construction site or job location – including photos, measurements, and daily reports. It doesn’t get any easier than this!
  • Central task management: All information flows into a central system where it can be automatically structured and tasks assigned. This greatly improves clarity and the controlling of major projects immensely.
  • Intelligent reporting: Create professional photo documents, measurements, and daily reports at the click of a button, which are easily accessible and understandable for all parties involved.
  • Automatic translation: Our platform supports automatic translation in over 50 languages, significantly simplifying collaboration in international teams and breaking down language barriers – barriers that can otherwise lead to major projects failing.

The key benefits of the Valoon integration

Using Valoon offers you crucial advantages to tackle the challenges that often lead to major projects failing. Through the seamless integration of common messenger services , your field staff can continue using the tools they are familiar with day-to-day. This greatly increases acceptance and minimizes training efforts. Our strong focus on simplicity and user-friendliness lowers the barriers to digitalization, especially in traditionally oriented industries. The automatic structuring of often unstructured communication into usable project data is another core advantage that helps break down annoying information silos and ensures that fewer major projects failing and thus increases the success rate instead of major projects failing. Optimize your construction planning and strategies with our support – we look forward to it!Talking from experience: Success strategies that really work

Section 07 – Success Stories and Best Practices

A truly positive example that shows that major projects failing does not necessarily have to be the end of the story is provided by the Justice Center Heidelberg. This project was realized under a public-private partnership (PPP) and was actually able to be completed under the planned budget – a true ray of hope! A key factor for this success was innovative procurement methods, such as bundling planning and construction. This reduced interfaces between the trades and minimized risks. Such approaches impressively demonstrate that well-thought-out contract designs, clear responsibilities, and fair risk distribution can significantly contribute to ensuring that major projects failing is avoided, rather than being caused by preventable reasons major projects failing. The law firm _, which advised on this project, emphasizes the importance of such innovative procedures.

Lessons Learned and Preventive Measures for Project Success

The analysis of both successful and failed projects provides us with incredibly valuable insights on how to prevent future major projects failing. It is important to understand why major projects failing, in order to learn from it. Among the most important preventive measures and best practices that consistently prove effective are:

  1. Realistic goal setting and thorough planning: Avoid overly ambitious timelines and underestimated costs through a truly careful risk analysis and planning of buffer times. This is not a weakness, but professionalism!
  2. Active stakeholder management: Involve all relevant parties early and ensure transparent communication and traceable decision-making. Engage the people!
  3. Clear roles and responsibilities: Clearly define responsibilities (for example with RACI matrices) and ensure that all team members understand their tasks and their significance.
  4. Use of modern technologies: Utilize tools like BIM, cloud-based project management software, and AI to increase efficiency and improve collaboration. This is crucial to successful major projects ensure and not fall behind.
  5. Flexible risk management: Implement a continuous process for identifying, assessing, and managing risks. A good project manager for major projects is essential for this and well worth the money.

These measures help you navigate the typical pitfalls that so often lead to major projects failing.Looking ahead: How we design successful projects – together!

Section 08 – Conclusion: The Future of Project Management

The challenge that major projects failing, as we have seen, is complex and multifaceted. But – and this is the good news – there are clear ways to significantly increase your chances of success! One culture of continuous improvement is absolutely essential. Companies and organizations must be willing to learn from mistakes – both their own and those of others – and continuously optimize their processes. The role of technology and innovation, especially in the field of communication and data processing, cannot be underestimated. Tools that simplify and structure the flow of information are crucial for creating transparency and enabling informed decisions. This is the only way to prevent unnecessarily high numbers of major projects failing, a fate that many major projects failing face.

A collective call to action for successful projects

The responsibility to reduce the high rate of failed large projects does not rest solely with the executing companies. It requires a joint effort from politics, business, and society. This includes simplifying bureaucratic processes, promoting transparency and genuine citizen participation, as well as investing in modern planning methods and technologies. If we are serious about strengthening our infrastructure and competitiveness, we must fundamentally rethink how major projects failing projects fail or succeed. At Valoon GmbH, we see ourselves as your partner on this journey. We offer you not only software but also an approach that can revolutionize communication in your projects and actively contribute to making ‘your major projects failing‘ a thing of the past. The optimization of construction planning and effective project control are key pillars for success.Your next step to project success: Get started with Valoon!

The integration of solutions like Valoon, which focus on simplicity and efficiency through the use of familiar messenger services , can significantly lower the entry barriers to digitization and make an important contribution to ensuring that your projects also reach the finish line. If you are now ready to optimize the communication and management processes in your large projects and significantly minimize the risk of your major projects failing, then now is the perfect time to act! Don’t let your major projects failingslip away! Don’t hesitate: Contact us today for a personalized consultation and find out first-hand how Valoon can help you bring your projects to successful completion. Visit our website or get in touch with us to take the first step. Let’s work together to ensure that your visions do not become part of the unfortunate statistics of failed large projects, where so many mit uns auf, um den ersten Schritt zu machen. Sorgen wir gemeinsam dafür, dass Ihre Visionen nicht zu den traurigen Statistiken der gescheiterten Großprojekte zählen, wo so viele major projects failing, but rather become shining success stories!

Why do so many large projects fail, especially in the construction industry?

Many large projects, especially in construction, fail due to a combination of complex bureaucracy, poor planning, and inadequate communication. Often, unclear project objectives, resource bottlenecks, and lack of transparency lead to significant delays and cost overruns.

Our field staff primarily use WhatsApp. How can this be utilized for professional project management without losing information?

This is precisely where solutions like Valoon come into play. By integrating WhatsApp , your employees can communicate as usual, while the software automatically converts messages into structured project data. This way, no information is lost, the data collection is simplified and double work is avoided.

We often have problems with information transfer between the construction site and office. How can this be improved?

A central platform that transmits information from the construction site to the office in real time and makes it accessible to all project participants is crucial. Tools that directly connect to messenger services, sustainably improve the flow of information, reduce misunderstandings and enable faster responses.

What are the biggest risks in monolithic project structures and how can they be minimized?

Monolithic projects are often rigid and very prone to disruptions; even small errors can jeopardize the entire project and bring it to a standstill. A modular approach, where projects are broken down into smaller, independent, or loosely coupled parts significantly minimizes this risk and allows for incremental value delivery and better adaptability..

How can the introduction of new software in traditional industries like crafts be facilitated?

The key is maximum simplicity and high usability. Software that builds on already known and commonly used tools like messengers and does not require extensive training significantly lowers acceptance barriers and fosters und keinen hohen Schulungsaufwand erfordert, senkt die Akzeptanzhürden deutlich und fördert die rapid digital transformation in the company..

What percentage of projects fail on average and what are the financial consequences?

Studies, such as those from the Project Management Institute (PMI), show that about 12% of all projects are considered completely failed. The Hertie School of Governance identified average cost increases of 73% for public infrastructure projects, which leads to immense economic damage and loss of trust.What role does social complexity (e.g., team leadership, communication) play in the failure of large projects?

Social complexity is often underestimated.

Lack of or unclear leadership, unclear role distribution, poor team dynamics, and ineffective communication structures are often decisive reasons why projects fail, even when the technical planning is actually solid. Actively managing these aspects is therefore essential. What is Building Information Modeling (BIM) and why is it important for large projects?.

BIM is a digital working method for construction that enables

intelligent 3D modeling and centralized data management for construction projects. It enhances the für Bauprojekte ermöglicht. Es verbessert die collaboration between all trades, increases transparency and efficiency and helps reduce planning errors and cost overruns that often lead to the failure of large projects.