In this blog post, you will learn everything you need to know about PDF templates for time sheets on construction sites. Recording working hours is essential for construction companies to create payroll accurately and comply with legal requirements. We will answer how a time sheet looks, which mandatory information must be included, and what regulations apply – including a free template for download as well as a step-by-step guide for correctly filling it out.
Why are time sheets on construction sites indispensable?
Time sheets on construction sites are more than just paperwork – they are an absolute necessity! Without them, it becomes difficult to accurately record working hours, calculate wages correctly, and meet all legal requirements. Especially in the construction industry, where working hours and tasks can change daily, a clean and accurate recording of hours is essential.
- Fairly compensate employees: Only with accurate time recording can payroll be prepared accurately.
- Legal security: During inspections by the tax office or customs, complete time sheets are mandatory.
- Avoid errors: Unclear or incomplete documentation leads to conflicts and claims for additional payments.
What does a time sheet in construction look like?
A time sheet should be clear and include all necessary mandatory information. The structure can vary, but typically includes:
- Paper format: Handwritten directly on the construction site
- PDF template: Filled out on a PC or printed by hand
- Excel template: Digitally on a tablet or PC
Essential mandatory information (source: bauprofessor.de):
- Employee’s name and personnel number
- Date and construction site designation
- Start, breaks, and end of working hours
- Brief description of the task
- Employee’s signature (and possibly the site manager’s)
Optional additional information:
- Overtime
- Weather-related interruptions
- Travel times to the construction site
Legal requirements
The Working Hours Act (ArbZG) stipulates that a maximum of 10 hours may be worked daily and 11 hours of rest time must be observed. Breaks must be documented. Violations may result in fines. (ArbZG)
The Minimum Wage Act (MiLoG) requires employers to record and retain working hours for at least two years. Subcontractors must also provide accurate time sheets. (MiLoG)
How do you fill out a time sheet correctly? (Step-by-step guide)
1. Enter employee data: Name, personnel number, date, and construction site.2. Record working hours: Enter exact start and end times as well as breaks (e.g., 07:00–12:00, break 12:00–12:30, 12:30–16:30).3. Description of activities: Briefly note, e.g., ‘Masonry work on wall A’.4. Signature: Employee and site manager should sign promptly after the end of work.
Download PDF template for free
Our standardized PDF template for time sheets – simply print, fill out, and file securely. Download here.
Conclusion
A PDF template for time sheets on construction sites saves time, ensures clear billing, and protects against legal risks. Whether handwritten or digital – accurate time recording is essential for every construction company.
Sources: bauprofessor.de, gesetze-im-internet.de, Freepik (icons)
“`